Wednesday, September 7, 2011

Joplin - Wall Preparation and Design Transfer

In 100+ degree heat we started work on site at 15th & Main. Here are pictures from Powerwashing,  Priming, and Transferring the design.

Design team member Hiram begins powerwashing.
The coolest job in town.
It took about 15 gallons.
Kyle when he still had his beard.
Amber touching up at the very top of the wall.
After some tinkering to get the image adjusted using a digital projector from across the street, transferring the design went smoothly.
We get to see the design at full-scale for the first time.

No comments:

Post a Comment